Answer Posted / kumars
Mostly 3-4% For Procurement, Actual around 3% , But Depends on Design,
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Where is the worlds longest elevator and how long is it?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Describe the role of independent Quantity surveyor?
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
What is meant by scaffolding coefficient?
residential projects,structural.
How to calculate volume of concrete & steel on tank foundation & ring wall ?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Did any of the egyptian pyramids ever fall down?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
When was the first motorway built in england?
what else we can add rather than admixture in concrete to reduce the cement quantity?
What is construction mitigation management?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
how much shouid be the rate for ready mix concrete per cubic meter