What will happen if the Air Preheater is placed before the Economiser?

Answer Posted / shivaling naik

For water temperature increasing....

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1425


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1765


How do you consider that you can improve and what assistance do you need to achieve this

1332


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1880


LAPT working in alternator / generator

2543






how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1227


How We Calibrate the vaccum transmitter?

1467


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2070


what does mean by kva rating

995


By any way can we increase the B check hours from 300 to 500

1695


what is the trip circuit supervision in an electrical meaning?

1439


explain how the third harmonic content of the magnetising current affects transformer design

2770


procedure of how to generate power in solar plant.

1375


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1474


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

2760