1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / suvra sankha chattopadhyay
For 1 cum of brick work ,C.M 1:6
Brick size= 9" 4.5" 3"
= 0.2286 x 0.1143 x 0.0762 cum.
Volume of Brick= 1.991028276 x 1/1000 cum.
Number of bricks= cum of Brick work/Volume of 1 Brick
= 502.2530378 or 503 number of Brick.
For 1 cum of brick work 25 to 30% C.M required
i.e; 0.3 cum of C.M.
Dry cement concrete required; due to 60% void in sand;
=0.3 + 0.3 X 60%
=0.48 cum C.M.
As the C.M is in the ratio of 1:6;
Volume of Cement required =0.48/(1+6)
=0.06857 cum
Cement bags required = 0.06857/0.0347
=1.976 or 2 Bags of Cement.
Volume of sand required = (0.48 x 6)/(1+7)
= 0.411428 cum.
or 14.5304 cft.
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
what is grade intersection?
How do you calculate reinforcement weight of steel?
what is modular brick and it size
how much repeitation for conventional and maivan formwork?
Mention different types of roof systems?
What is the diff between cad & cadd?
What are wooden shingles?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
explain the rale of the government in the construction industry
What should be the standard roof height like to be?
what is civil enginnering & what you need of this course?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
How do we calculate absolute pressure?