Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What will happen if id fan on boiler not functioning?.Can the
Boiler run without id fan? What is the effect?

Answer Posted / sheik nasir hussen

First of all Boiler willn't start without ID FAN due to Boiler interlock if by bypass this logic we start the boiler then draft can't be set without ID FAN Boiler will be trip with furnace draft high.if this logic also bypass then furnace will be pressurised before reaching required amount of air flow for combustion &proper combustion willn't occure which will damage the furnace tube and also there is a chances of furnace blast.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

operation

1885


what's the moog valve

1497


what is restricted earth fault explain in details

2042


what is the trip circuit supervision in an electrical meaning?

2113


Why superheated are started before I'd and rd fan?

2175


What is LB-SR.

2993


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3400


By any way can we increase the B check hours from 300 to 500

2188


what is natural frequency of turbine shaft .

2279


LAPT working in alternator / generator

3616


explain how the third harmonic content of the magnetising current affects transformer design

3266


what is the difference between compensated & normal drum level in boiler drum?

1797


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2409


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2474


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2535