deshuttering time for RCC for DPC over the foundation.
Answer Posted / amit
for side shuttering=1 day
but as per is 456-2000,Bottom deshuttering of slab and beam are done when Concrete achieved 65% of its actual ulmimate strength.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
why we use aggregate,sand with cement in concrete?
How to plan a project
What is critical path method (c.p.m)?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What are the techniques to measure road difference?
In case if concrete box girder bridges how is the number of cells determined?
How many cum of 9.5mm stone in 1 ton ?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Which code is used for tor & tmt steel bar?
to minimize budget cost of building , what can i do
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
What is the absolute pressure scale?