deshuttering time for RCC for DPC over the foundation.
Answer Posted / amit
for side shuttering=1 day
but as per is 456-2000,Bottom deshuttering of slab and beam are done when Concrete achieved 65% of its actual ulmimate strength.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
What is gravity flow?
what values & beliefs have guided you in your career path
how to nfind out the specific gravity of sand.aggregate,water please help...
How do you measure water flowing through 300mm diameter pipes?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
can you give me the details of rate analysis of steel and concrete?
what is w/c ratio in dry lean concrete for m10 mix design
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
How much does the leaning tower of pisa lean?
what is hydrostatic paradox?
How do you calculate the power of a centrifugal pump?
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is need for setting limits?