Answer Posted / sruthi patel
Any BPM effort requires the modeling of an existing (“as-is”) or desired (“to-be”) process, i.e., a process design. During this phase process models including vari- ous perspectives (control-flow, data-flow, organizational, sociotechnical, and oper- ational aspects) are constructed. The only way to create a “process-aware” enter- prise information system is to add knowledge about the operational processes at hand.
What is System configuration?
Based on a process design, the process-aware enterprise information system is real- ized. In the traditional setting the realization would require a time consuming and complex software development process. Using software from the second and third layer shown in Figure 1, the traditional software development process is replaced by a configuration or assembly process. Therefore, we use the term system config- uration for the phase in-between process design and enactment.
What is Process enactment?
The process enactment phase is the phase where the process-aware enterprise in- formation system realized in the system configuration phase is actually used.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Explain about durable?
What is WP3 Synchronization?
What is WP12 MI without Synchronization?
How to Model complaints handling process in terms of a WF-net?
What is WP10 Arbitrary Cycles?
What is WP16 Deferred Choice?
explain about sla?
What is WP2 Parallel Split?
What is XPDL(XML Process Definition Language)?
how do you enable javascript debugging for the coaches?
how do you fire a boundary event pro-grammatically?
What is WP18 Milestone?
what are under cover agents (uca)?
What is WF-nets?
what is a coach?