Answer Posted / sruthi patel
Any BPM effort requires the modeling of an existing (“as-is”) or desired (“to-be”) process, i.e., a process design. During this phase process models including vari- ous perspectives (control-flow, data-flow, organizational, sociotechnical, and oper- ational aspects) are constructed. The only way to create a “process-aware” enter- prise information system is to add knowledge about the operational processes at hand.
What is System configuration?
Based on a process design, the process-aware enterprise information system is real- ized. In the traditional setting the realization would require a time consuming and complex software development process. Using software from the second and third layer shown in Figure 1, the traditional software development process is replaced by a configuration or assembly process. Therefore, we use the term system config- uration for the phase in-between process design and enactment.
What is Process enactment?
The process enactment phase is the phase where the process-aware enterprise in- formation system realized in the system configuration phase is actually used.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is WP11 Implicit Termination?
how do you enable uca to start a bpd?
What are different types of human tasks?
what are coaches?
What are Workflow standards?
explain about sla?
What is Petri nets?
what is uca? (Under cover agent)
Explain about durable?
How to Model complaints handling process in terms of a WF-net?
What is WP12 MI without Synchronization?
what are under cover agents (uca)?
what is durable subscription?
how do you analyze the time elapsed between the activities in process?
what are variables(business objects) in ibm bpm?