what is mean by bleeding of concrete
Answer Posted / khans
sqeezing out water from fresh concrete is termed as bleeding.it takes place due to excess of water and also because of this the concrete losts its strength
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
How to calculate plastering for elevated water storage tank
How many lbs are there in a yard?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
what does the grad of cement shows (denotes)?
What are the causes of building collapse?
how do we design mix ratio?
how to caliculate required amount of cement and sand required for 1cu.m.
Formula of mid span bar
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Under what circumstances should pot bearings be used instead of elastomeric bearings?
why building got air crack? if it get in one particular are what is means?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
how to absorb to site basic corrections? which are the important correction?