Bleeding of concrete occur due to excess of water ,by the excess of water the cementious material wash out. and due to this concrete lost their strength.
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
115mm thickness brick work how to required mortar
How to do bbs in excel format
HOw much % of premium on DSR-2013 currently
what is the percentage of silt in black cotton soil.?
What is command line?
what is floating slab foundation?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What is Architect-Prepared Contract?
A doubly reinforced concrete beam is 25 cm wide and 50cm deep to the centre of tension reinforcement. The centre of compression is steel is 5cm from the compression edge. The areas of the compression and the tension steel are 10.16cm2 and 12.56 cm2 if m=18 and the bending moment at the section is 7,000,000 N-cm. Calculate the stress in concrete and steel.
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?