Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How is rate analysis prepared for M 25 grade of concrete?

Answer Posted / simarpreet upweja

Total Cost will be Material cost + Labour cost + Mode of pouring + mode of mixing and transit + Shuttering Cost + Curing cost in later stage

Material cost will include cost of water + Recron(any fiber if adding) + admixer + coarse aggegate + fine aggregate + sand + Cement + Flyash (if using crush sand).

There are many ways of mixing.
i) If using batching plant then cost of transit millers and plant.
ii) If mixing is done at site by mixer then there will be no cost of transit.
iii) If mixing is done manually then it will be covered under labour cost.

Labour Cost : Self Explanatory

Shuttering Cost : As per surface area multiplied by cost per unit area.

Curing Cost : Self explanatory. Curing can be done by many ways so first you will have to decide method.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1936


What is the meaning of a blue land surveyors flag?

1452


What is Joule Brayton Cycle?

1244


Which is the direction for positive angle?

1336


What is modular elasticity?

1180


What is the strength of cement?

1264


what is the type of earthing

2237


what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..

2508


How to plan a project

2305


how much shouid be the rate for ready mix concrete per cubic meter

2037


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3108


Which percentage of carpet area use in plot area of office building.

2010


How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?

2326


what is thumb rule for calculating the size of ISMB required for a particular length of span

3457


How to determine spacing of bars in slabs or beams

2475