How is rate analysis prepared for M 25 grade of concrete?
Answer Posted / simarpreet upweja
Total Cost will be Material cost + Labour cost + Mode of pouring + mode of mixing and transit + Shuttering Cost + Curing cost in later stage
Material cost will include cost of water + Recron(any fiber if adding) + admixer + coarse aggegate + fine aggregate + sand + Cement + Flyash (if using crush sand).
There are many ways of mixing.
i) If using batching plant then cost of transit millers and plant.
ii) If mixing is done at site by mixer then there will be no cost of transit.
iii) If mixing is done manually then it will be covered under labour cost.
Labour Cost : Self Explanatory
Shuttering Cost : As per surface area multiplied by cost per unit area.
Curing Cost : Self explanatory. Curing can be done by many ways so first you will have to decide method.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What is the meaning of a blue land surveyors flag?
What is Joule Brayton Cycle?
Which is the direction for positive angle?
What is modular elasticity?
What is the strength of cement?
what is the type of earthing
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
How to plan a project
how much shouid be the rate for ready mix concrete per cubic meter
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
Which percentage of carpet area use in plot area of office building.
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is thumb rule for calculating the size of ISMB required for a particular length of span
How to determine spacing of bars in slabs or beams