Answer Posted / nandan kumar
There is two condition of choosing one way slab based on span deflection
1.Slab is supported on two opposite side wall.
2.If slab is supported on four side than Ly/Lx should be > than 2.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
When was the first motorway built in england?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
whaat is blister in box girder bridge and what is its function..
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
how to clculate the %of concrete strenght achive after curing?load
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
How many types of slabs are there & how to design it?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
what is mean by c32/40s concrete class