Answer Posted / nandan kumar
There is two condition of choosing one way slab based on span deflection
1.Slab is supported on two opposite side wall.
2.If slab is supported on four side than Ly/Lx should be > than 2.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is a well
how to find out hard strata in bored pile when the DMC method adopted.
Calculation of curtain wall of box culvert
How to calculate brick work quantity?? Block work quantity??
all technical question
What is limit state method and working stress method and ultimate method
what is the maximum number of course that can be laid according to IS code and the max height.
punj loyed and sapurjl palanjl
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is the use of extruded feature in solidsworks?
What is packing Factor ?
What is the usage of zoom command?
what is the criteria for the finalisation of pavement thickness in road project?