What is a BBS?Find out the cutting length for a foundation size 600 x 600, cover 50 mm?
Answer Posted / piyush singh
BBS Stands for Bar Bending Schedule.
For a 600mm * 600mm Foundation and 50 mm cover
Cutting length will be
= 600-left cover - right cover
=600-50-50
=500mm
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
Explain what is structural frames or systems?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
Define What is made from large rocks, which protects the base of cliffs?
Explain what is change order request?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
in one SQM plaster how much Cement and sand consumed in ratio 1:4
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
which has high compressive strength between hollow block and brick masonry?
what are the five benefits of using standard terminology in the measurement process?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
Which is the direction for positive angle?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
how much cost of single coat 20mm thick plastering per sqre meter