Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is a BBS?Find out the cutting length for a foundation size 600 x 600, cover 50 mm?

Answer Posted / piyush singh

BBS Stands for Bar Bending Schedule.

For a 600mm *  600mm Foundation and 50 mm cover 

Cutting length will be 

= 600-left cover - right cover
=600-50-50
=500mm

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)

1830


Explain what is structural frames or systems?

1146


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2231


Define What is made from large rocks, which protects the base of cliffs?

1080


Explain what is change order request?

1135


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2632


in one SQM plaster how much Cement and sand consumed in ratio 1:4

2238


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1956


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

2031


which has high compressive strength between hollow block and brick masonry?

2382


what are the five benefits of using standard terminology in the measurement process?

2199


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

5056


Which is the direction for positive angle?

1331


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

2386


how much cost of single coat 20mm thick plastering per sqre meter

1631