what do u mean by shear?and tension?
Answer Posted / vignesh.r
shear is horizontal moment but always occour from beam column joint steel almost act from tension
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What things architect have to take care of before starting any project?
how meny typs of renging rod?
How does siphoning work?
Process of pcc in wateredug
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
Define What is aggregate?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
How to plan a project
What is meaning of tlc
Slab quantity
how to calculate freeboard in under ground water tank and technical details