How to calculate the no of bags required for 12mm thick 1:6
plastering?
Answer Posted / goutam giri
Considering 100 sqm plaster.
Wet Volume of plaster =100X0.012 =1.2 cum.
Add @ 20 % for filling the depressions, joints, wastage, etc.=0.24 cum.
Total=1.44 cum.
For dry volume of mortar increased by ⅓ of volume =0.48 cum.
Total dry volume of mortar =1.92 cum
Volume of cement:-1.92/7 = 0.2742/0.0347 =7.9 bag
Volume of sand:-0.2742*6 = 1.6452 cum
| Is This Answer Correct ? | 32 Yes | 4 No |
Post New Answer View All Answers
what is the minimum compressive strength of clay brick
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What is the substitute of Mastic Asphalt?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Why is the statue of liberty made of copper?
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
what is education Cess.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
Did any of the egyptian pyramids ever fall down?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
water leak detection system question & answer
for pretensioning which will yield first and same for post tensioning?