Answer Posted / ghantola
It is the no. of persons alloted to manage the site at managerial, executive and supervisory levels.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
water leak detection system question & answer
how to calculate valuation for the old building?
how much cement and sand required for 100sqm of wall plastering in different proportions
How to calculate brick work quantity?? Block work quantity??
What is type failure of road surface? how to repair the failure of road surface?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
what are the types of dimensioning?
what is mc arther pile?
115mm thickness brick work how to required mortar
what is the composition of good brick ?
What is the difference between EPC,DBOOT and BOOT.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
what is anchorage length,lap length and (dont remember the last one)