Answer Posted / ghantola
It is the no. of persons alloted to manage the site at managerial, executive and supervisory levels.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is Curtailing of R/F
how to calculate load bearing column
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
what is w/c ratio in dry lean concrete for m10 mix design
what is hydrostatic paradox?
what is modular brick and it size
construction workers how much time take one work or qty
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
what values & beliefs have guided you in your career path
Are you ready to relocate with your immediate family to United States as a new employee?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
water leak detection system question & answer