What is meant by 'zero value' in quantity surveying.
Answer Posted / divusp
the actual cost of the each activities to be performed is calculated at start/ZERO date of the project is called zero value
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What was asked in isro civil interview
how to do cementicious paint for rcc walls of cw pump house
What is Grid floor and mention its advantages ?
why we use aggregate,sand with cement in concrete?
How to plan a project
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What is structural frames or systems?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
length where bent up is made in slab of bridge from one end
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
what is diffrence between catchment area,watershed and basin?
how to calculate MR 9(derivation)
how i convert mm into standard wire guage (SWG)no.
significance of specific surface area of particles?