Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

9*8m slab 1:2:4 ratio use for M20 mix how much cent is
require it will become in cum but i want bags.

Answer Posted / sundarapandiyan

Bulk material qty for one cum conc=1.52 cum(using 20mm and lesser size aggrigate)
Concrete ratio 1:2:4 = 7 part
cement =1 part
for 9x8m = 72 sqm
assume thickness as =100mm
so cc qty=9X8x0.1=7.2 cum
cement= (7.2x1x1.52)/(1+2+4)=1.563 cum
bulk cement density= 1440 kg ( for clarification cement density mean specific gravity =3.15 mean 3150kg /cum)
so cement in kg=1440X1.563 =2250.72kg
cement in bag= 2250.72/50=45.014 bag can assume as 45 bag.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the most suitable foundation when construct a bird watching tower in a marshy land

1877


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

2266


what is castigliano theaorem

2275


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2609


what does the grad of cement shows (denotes)?

1608


"Gates of the dams are generally designed of curved shape". Why?

2065


What is the tensile strength of wood?

1204


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2286


is concealed wiring a problem in fly ash brick wall?

2552


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1886


Mention what are the composition of a landfill?

1151


How we calculate the service time of buildings

1875


punj loyed and sapurjl palanjl

2380


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

6418


What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers

2304