what is the responsibilities of electrical project engineer?
Answer Posted / anand
Coordinate with other agencies clear the way/route before execution.
After the planning part is over define the role & responsibility of sub staff/junior/executer so that they don't mix in the same field or job & create problem. If some special type of project is there then highlight the portion which ever need extra care, during execution work to be check that work is going in right track.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
In diesel generator how AVR get voltage to excitation. And basic diagram DG EXCITATION CIRCUIT.
1.4 What is meant by CT knee point voltage and how would you determine it
What is the effect on in Zone and out zone fault if Phase side CT is Vk/2<30 mA and Neutral side is CT is Vk/4<30 mA for Transformer REF protection
how we can calculate power factor in single phase & three phase ?thank u
What is superposition theorem?
Why an ac systems are preferred over dc systems?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
What current position are you holding in your current company?
why 3 phase is converted into 2 phase using electronics circuit why not 2 phases are diresctly putted from the 3 phase transformer??
There is any especial requirement for motor to drive through with VFD?
what is charger supervision and control supervision?
How to use computer cpu ups use for home inverter circuit board
can we use engine degreaser for electrical motors?
how to calculate the fault in substation
CBCT selection