Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

On load tap changer (OLTC) explode?
Transformer
Vector group: Ynd11
Rated Power: 353MVA
Rated Current: 693A
Voltage:294/20KV

OLTC
Type: T III Y1000 110/c 12193w
Max Operation Current: 295A
Step Voltage: 550V
Arrangement in Tx windings: Y Connection

Problem: Damage of Unit 1 Generator Transformer On Load Tap
Changer (OLTC)

Description of Incident:
9.00 a.m. :- Generator No Load test on excitation system
started

10.30 a.m :- Carried out AVR change over
test

11.30 a.m :- Preparation for Generator Manual Synchronizing
test


12.00 a.m :- Manual Synshronizing test started.
Observed incoming generator voltage higher than running voltage.
CECR operator operated Generator Transformer OLTC to bring down
the incoming generator voltage

12.03 a.m :-Generator Transformer abnormal alarm operated at
Gen.Control Desk (CECR)
CECR operater at Generator transformer bay informed that the
transformer
oil splashed out from OLTC.
CECR operater informed that he heard explosion inside OLTC.
Observed Oil level & Oil Flow alaram operated at Tranformer
local annunciator.

12.05 am :- CECR operator 'Open Gen Field Breaker”

12.10 a.m. :- Elec1 team inspected the OLTC and found the
OLTC rupture disk was broken
and oil spilled at OLTC area.
- Elec1 found the OLTC top cover bulging.

Do anyone know why and possibility cause happen in this OLTC.

Answer Posted / jayesh n patel

failure is happend after tap operation , chances of contact stucking in between positions and full load current passes more time through transition resistance( as per design current passes for 60 to 90 mili seconds only, while snape action)and it got burnt ,and voltage has cut with big spark, sudden pressure has develop in side the tank and oil has got expand which result in bulging of top cover and oil spread,(mechanical failure result in electrical failure).

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explanation of mesh bus bars

2156


Name a govt approved university which have 100% online engineering course.

1708


why -48 volts dc used in telecommucation

2629


prove that power consumed in 3 phase delta system is 3 times as compared to 3 phase star system

2236


How to calculate the fuse rating depend upon the DC circuit?

2853


how to decide the panel size like MDB ,SMDB PANEL SIZES

7346


In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]

1979


List the time domain specifications.

1052


EXPLAIN THE ESSENTIAL FACTORS WHICH INFLUENCES THE CHOICE OF SITE FOR A HYDRO ELECTRIC POWER PLANT

2242


we use 400/5A ct and 35/roor3KV,/0.1/root3KV,0.1/root3KV pt ratio. What is the multiple factor of this meter.

1997


Batteries. What is the difference between Lead and Nickel batteries ?

2198


Where can i get practical knowledge of solar system?

1445


PLZ SEND ME SOME UNIQUE PROJECT OF ELECTRICAL ENG (B.TECH)

1945


How wire size can define in electrical wiring? What is the ratio?

2291


R=*¶ l/a

1609