Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

On load tap changer (OLTC) explode?
Transformer
Vector group: Ynd11
Rated Power: 353MVA
Rated Current: 693A
Voltage:294/20KV

OLTC
Type: T III Y1000 110/c 12193w
Max Operation Current: 295A
Step Voltage: 550V
Arrangement in Tx windings: Y Connection

Problem: Damage of Unit 1 Generator Transformer On Load Tap
Changer (OLTC)

Description of Incident:
9.00 a.m. :- Generator No Load test on excitation system
started

10.30 a.m :- Carried out AVR change over
test

11.30 a.m :- Preparation for Generator Manual Synchronizing
test


12.00 a.m :- Manual Synshronizing test started.
Observed incoming generator voltage higher than running voltage.
CECR operator operated Generator Transformer OLTC to bring down
the incoming generator voltage

12.03 a.m :-Generator Transformer abnormal alarm operated at
Gen.Control Desk (CECR)
CECR operater at Generator transformer bay informed that the
transformer
oil splashed out from OLTC.
CECR operater informed that he heard explosion inside OLTC.
Observed Oil level & Oil Flow alaram operated at Tranformer
local annunciator.

12.05 am :- CECR operator 'Open Gen Field Breaker”

12.10 a.m. :- Elec1 team inspected the OLTC and found the
OLTC rupture disk was broken
and oil spilled at OLTC area.
- Elec1 found the OLTC top cover bulging.

Do anyone know why and possibility cause happen in this OLTC.

Answer Posted / jayesh n patel

failure is happend after tap operation , chances of contact stucking in between positions and full load current passes more time through transition resistance( as per design current passes for 60 to 90 mili seconds only, while snape action)and it got burnt ,and voltage has cut with big spark, sudden pressure has develop in side the tank and oil has got expand which result in bulging of top cover and oil spread,(mechanical failure result in electrical failure).

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which thing is maximum in RLC circuit at resonance a)power consumption b)inductive current c)capacitive voltage

1739


what is meant by directional earth fault and non directional earth fault? describe both.

1840


Why the output of OP-AMP is always less than Vcc?

1846


Explain Energy and Power signals?

1704


Give idea about General Engineering. From which book i can study this topic. Pl. reply me via email. My email is ravi@bhelhwr.co.in, also give the name of book/website, from where i can prepare it.

2002


Why generation voltage in thermal power plant is between 11kv to 33kv?

982


Please brief working principle & construction of permanent magnet AC Servo motor

2164


what is sevice settings for mccb?How can be it setted?

1921


why we are using Load factor?

1846


electrical ques

2081


Why air circuit breaker off due to power failure?

1134


A 100 kVA , 400 v/250 kv testing transformer has 8% leakage reactance and resistance on 100 KVA base . A cable has to be tested at 500 kv using the above transformer as a resonant transformer at 50 hz . if the charging current of the cable at 500 kv is 0.4 A find the series inductance required . Assume 2% resistance for the inductor to be used and the connecting leads . Neglect dielectric loss of hte cable . what will be the input voltage to the transformer ?

5178


please send me RRB electrical engineer previous year questions for Sr. Section Engineer

1883


how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.

2433


limitation of conductor height on ground when we consider EMC

1973