how we calculate the knee point of a protection and metering
CT and what is the testing procedure.

Answer Posted / nur.asidik

knee point voltage is only for protection, not for measurement, it is depend on your protection you need,for example, 87 need higher Vkp than 50/51, just follow your relay requirement. I mean your CT Vkp should higher than Relay required Vkp. refer to IEC, for class 5P or 10P, Vkp is as a function of ALF, Rct, VA, and secondary ratio of CT

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Load sharing of Transformer ?

1554


actually i can't understand what is 3dB ? and it's really not clear to me.please any one let it me be cleared.

1736


What facility we get after CT secondary earthing and how?

1728


how many Classification of fire extinguisher

1675


How to test the vector group of a Yd11 transformer? what are the relations to be checked between various vectors to confirm this vector group?

4007






how can we determine size of a cable by knowing the kw or current rating of a load?how can we calculate the resistance box of a slip ring motor?

1336


how can get electrical "c" licence.i am complited in DEEE.PASSING YEAR OF 1993.WORKING IN PVT COCERN LT LINE.PLEASE ADVISE ME .CELL NO 9994786021

1531


how freewheeling diode improves the powerfactor

4857


hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar

1547


Is it possible to make a 5P10/ CT Ratio 50/1A Burden 5VA

1233


why do we lay up the core of a cable?

1614


What happened ,If 3 phase clearance not maintained in 33KV Line,11KV LIne etc?

1824


I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE

1495


Two bulbs of 100w and 40w respectively connected in series across a 230v supply which bulb will glow bright and why?

627


Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics

1872