How much percent dry volume consider for concrete
Answer Posted / bharath m/8438238335
For 1m3 wet volume concrete,1.57 m3 or 157% dry volume required if mix using 20 mm metal.
and 1.52 m3 or 152% dry volume required if mix using 40 mm metal.
This is based on Experimental Investigations arrived.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
What was asked in isro civil interview
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
I want to join bhel because
what is right & short method of measurement of slab&beam
pls mail some more tecnical qustions at msaranya2610@gmail.com
Material calculation of cm 1:6 for 1sqm
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
what is relation between SPT N value and driving piles after conducting a soil test?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
what is the difference between natural draught cooling tower and induced draught cooling tower
Critical Path Method is...
How to calculate steel for beam slab and column