how to calculate rate analysis of M25 grade concrete
Answer Posted / mandamalaki
M25=1:1:2
one bag cement = 50 Kg
Density of cement=1440
one bag cement =50*1440=0.034 cum
one cum dry volume cement =1.52
total ratio=1+1+2= 4
Dry volume of cement/ Ratio
=1.52/4= 0.38
cement=1*0.38=0.38
require cement in bags=0.38/0.034(1 bag cement volume)
=11.17 bags
Sand=0.38 cum
stone chip=.38*2= 0.76 cum
Note
*The rates may vary depends on location
| Is This Answer Correct ? | 78 Yes | 21 No |
Post New Answer View All Answers
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
how lap length is increased with increase of Grade of steel?
Define What is a kip?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
How do you calculate the unit weight of concrete?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What is meaning of FREE STANDING STAIRCASE ?
Wat is meant by Aecron brick?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
give me the rate analysis for Bituminous Macadam and SDBC
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
what is the formula for Mass of cement grout (Dg)=???
how to find ssm in foundation?
door and window wood work calculations and different methods