how to calculate rate analysis of M25 grade concrete

Answer Posted / mandamalaki

M25=1:1:2
one bag cement = 50 Kg
Density of cement=1440
one bag cement =50*1440=0.034 cum
one cum dry volume cement =1.52
total ratio=1+1+2= 4
Dry volume of cement/ Ratio
=1.52/4= 0.38
cement=1*0.38=0.38
require cement in bags=0.38/0.034(1 bag cement volume)
                      =11.17 bags
Sand=0.38 cum 
stone chip=.38*2= 0.76 cum
Note
*The rates may vary depends on location

Is This Answer Correct ?    77 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the absolute pressure scale?

675


what is parametre for M25 after 7 days strength

1514


How to get MEP technical,instaaltion & testing data for interview?

1603


What is meant by solid geometry?

642


How to find beam R/F cutting length

1225






how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step

1645


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1956


strength of bitumen concrete with 80-100 & 60-70 grade bitumen

1660


What is a kip?

717


what is Brick crushing strength(PSI)?

845


what is the difference between replacement of cement by groundnut shell ash

2506


Process of pcc in wateredug

1799


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2382


how can we calculate steel value, depending on load

1739


How to calculate brick work quantity?? Block work quantity??

2111