calculate if the size of the beam is 300*500 then L for the top & bottom bar
Answer Posted / sreekumar
if the cover is 30mm each L = 440mm
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
how to calculate the concrete mix m30 by volume
Minimum and maximum size of the building components
What are the advantages and disadvantages of using plastic and timber fenders?
how statics is different from dynamics
What is zoning permit?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
How to find CN by using arcgis 9.3?
What is the snap size in civil and how can we create it?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
types of laps in column
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Material calculation of cm 1:6 for 1sqm
Define What materials were used to build the Golden Gate Bridge?
rate analysis for cement pointing 1:4 , for 100 sq m
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?