Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the condition of transformer parallel operation ?

Answer Posted / rakesh. a.d

Two transformers terminal voltage should be same
Two transformers impedances should be same

Is This Answer Correct ?    8 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is LB-SR.

2949


what is restricted earth fault explain in details

1992


Why superheated are started before I'd and rd fan?

2117


why do you consider yourself a suitable candidate for this position

7379


can dp type level transmitter work in under vaccum condition

1937


im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much

1932


explain how the third harmonic content of the magnetising current affects transformer design

3203


By any way can we increase the B check hours from 300 to 500

2140


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2234


what is the basic use of power plant in equipment

1666


How to calculate power press toneage

2002


why airtel use + 24 volts and other operators use -48 volt

2564


what is the difference between compensated & normal drum level in boiler drum?

1737


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2410


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2371