calculate if the size of the beam is 300*500 then L for the top & bottom bar

Answer Posted / vijay

ans. is 425 but how explain it..

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What materials were used to build the golden gate bridge?

818


Which are the top apps for you civil engineer?

725


how to calculate weight of 1.8 cum of aggregate

1299


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1555


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1243






In block work seawalls what is the purpose of slip joints?

764


WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?

1858


How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently

2066


The 4 main factors to start a construction project are––

1796


Bernaullis theorem deals with the law of conservation of mass momentum energy none

1588


what is modular brick and it size

1175


Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????

1616


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2146


I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

1784


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

91608