Answer Posted / hiren
1:2:4=M15
1:1.5:3=M20
1:1:2=M25
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what is polity
how can i calculate cement in brickwork
sir, whitch is the best book (writer name) for prepration of gate....
Which is the latest version of solidsworks?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
what is your role of in previous company as a construction manager
Explain the difference between shear and tensile strength.
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
Define What is the best type of wood glue?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream