Answer Posted / hiren
1:2:4=M15
1:1.5:3=M20
1:1:2=M25
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
Explain the difference between shear and tensile strength.
How to calculate 1 brss for RCC work
mix design procedure for 1:6 cement mortar
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
What is the release of lien?
what is the difference between tsp & tower
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
Define What is diversion tunnel in a dam?
Why do you want to work here
What is the procedure of concealed plumbing in toilets?
What are the important hardware systems used for cad?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how can we calculate steel value, depending on load
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
which red: used in roof teping, then use only cement