Answer Posted / hiren
1:2:4=M15
1:1.5:3=M20
1:1:2=M25
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
Floor tile measurement? Wall to wall or skirting to skirting
what motivates you to do a good job
how to convert cement, sand aggregate quantity from M3 to kg with full description?
How much quantity water should be placed in one cubic meter area?
How many kilo-newtons equals 1000 kilogram?
how we calculate the vol.of wet concrete..?
What is the difference between routing maintenance and major maintenance in school facilities?
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
important question on stones
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
How do You Maintain a structure after getting cube test of low strength.
rate analysis hiring of generator 62.5 KVA
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?