Answer Posted / subhash
including wastage 500nos
excluding wastage & mortar 460-465nos
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
how statics is different from dynamics
What is the substitute of Mastic Asphalt?
how to calculate the density for high density concrete ? or is it same as the density of RC?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
WHAT IS YOUR EXPECTED SALARY?
Civil engineering material testing Standard results
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
I am called for interview from north east power plant .so, I need some interview question which may help me.
What is the density of DLC & PQC and how it is differ from normal concrete?
What is Critical path in Ms-Project ?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
What is meant by scaffolding coefficient?