Disconnect the field sensor.
Connect a calibrated/traceable temperature signal calibrator.
Apply LRV value.
Trim the 4.0mA output.
Apply the URV value.
Trim the 20.0mA output.
Check as many interim points as the calibration protocol requires and note the output and the deviation from the expected value.
Determine whether the transmitter is within spec from the deviation values seen.
If transmitter passes, reconnect the field sensor to the input.
Fill in the paperwork.
Carl Ellis
Measure First
| Is This Answer Correct ? | 9 Yes | 3 No |
Post New Answer View All Answers
what are the values of fuel flow rate in various places in boiler.
PT RTD Range: -200 to 500 degree celsius If I configured in DCS Lower range and Upper range . In face plate it shows red colour due to overa range how was the characteristics look If the temperature is more than operating range. how was the characteristics look . whether its in Resistance vs Temperature curve is Linear or Non linear
Exothermic reaction./ endothermic reaction
Explain operation of Haskel pump.
any body please send me the old question papers of ongc test.
can we copy the software from a transmitter using hht(hart 275) ?
Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com
selection of the zener barrier for the hazardeous area zone 0
kindly sent some demo question and answer
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
Draw a group of instruments interlocked to a Pump & Motor?
Difference between dcs and plc including date processing and architecture.
I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.
What is the GK Value in Flowmeter?
WHAT IS THE CAM POSITION IN CONTROL VALVE POSITIONER ? WHY IT IS USED?