how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / vijayababu`
M25 – 1:1:2
Total parts – 4
Cement Required for 1 cum =1/4X1.57X1440
= 0.393X1440 = 567kg/cum
= 11.34 bags/cum
Is This Answer Correct ? | 17 Yes | 3 No |
Post New Answer View All Answers
What do we mean by partial moment release ??
what is the name of shuttering oil used in oman
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
What is semirigid connections?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
how to take concrete quantity for precast segment for viaduct project?
roll of DLC in road constructions
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is the meaning of soil reinforcement?
Explain the mechanism of cavitations in pipes and drains?
how many litres of enamel paint required for 5000 sft of site??
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
Define mirror?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?