"Why you consider yourself suitable for the post"
Answer Posted / srinivas
I believe that my knowledge, attribute, skills, working
experience, and inspiration that the position required
makes me suitable candidate for this post. I can
confidently carry out the task mentioned in your job
description. I consider myself a committed team player who
also relishes challenges and readily assumes responsibility
and accountability in a personal performance role where
initiative is vital. The software expertise gave me a good
foundation to build on. I can add value and make a
worthwhile contribution to the company’s growth with
technical essentials which I have gained during my past
service career. My attitude and temperament best suits the
nature of the job. And therefore, I am eager to enter in a
new working environment. I would like the opportunity to
contribute to the efficient operation of a well known
company and to earn advancement through on-the-job
performance.
Is This Answer Correct ? | 69 Yes | 18 No |
Post New Answer View All Answers
How many cement sand ballast in cc 1:4:8 40mm
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
how to calibrate the RM 800
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
what is civil engineer greatest strength and weakness?
what is the difference between tsp & tower
What are the steps involved in the concreting process?
what is the construction cost for per cft of multistorryed building in kolkata?
How to calculate quantity of plum masonry in 1:3:7
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What are the benefits of rcc pipes over steel designed pipes?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream