step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is Brest Wall?
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How to do base isolation for RC framed structure using ETABS software?
what is the 0 value in quantity surveying
How are freeway bridges built?
what is the relation between pitch of steel and depth of slab?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
HOw much % of premium on DSR-2013 currently
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is constat for brickwork
What is the l/d ratio of cantilever beam?
calculate the quantity of water for 1:6 cement mortar