why the power cut problems occur in tamil nadu?
may i know the exact reason.plz

Answer Posted / dinakaran

Implementing Solar Power Projects in war footing will have Renewable Energies Utilised and When NO SUNLIGHT, fossil fuels can be used to generate power!!

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

why should small green grass ans small plant should not be there inside the transformer Yard in the factories

1306


In AC if the direction of current keeps reversing every half cycle, how does it propogate through the transmission lines?

1733


what is the difference between electrical and electronic choke?

1572


From reading, Under voltage relay used also as phase sequence relay now, Why I use under voltage and phase sequence relay in the same circuit (ATS)?

1409


WHAT IS SITTING AMPS IN OVER-LOAD RELAY FOR 1PH OR 3PH MOTORS?IF ITS NAME PLATE GIVEN MAX AMPS 10AMPS?

1416






can u describe the method used for protection of transmission line.

1737


what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group

1715


How to calculat the ratio of HT\LT in energy meter

2262


what is active power & reactive power?

1796


Draw transformer phasor diagram.(full load,no load)

3787


how to calculate the change over time for star delta starter for different KW motor?

3843


when measure the core loss of three phase distribution transformer or three phase reactor loss, one phase shown negative watt loss. why??

1618


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7142


the grid connection required for a 50 MegaWatt fotovoltaic powerplant is higher or lower than 35kv (high or medium tension)?

1522


How they LT panel busbar size choose

1359