How many bricks are required for 100 sq ft 5" & 3" wall, Brick size= 230x115x75

Answer Posted / md shamim

5 inch thickness wall 100 sqft req. 480pcs bricks
and 3 inch thickness wall req. 100 sq ft. is 280 pcs bricks

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1770


I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?

1333


How to find out kg per Sft ?

1918


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2366


Explain major difference between auto level and dumpy level?

853






how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.

1761


how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6

1110


What is Architect-Prepared Contract?

832


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2614


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1733


if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?

2469


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1482


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1994


why are you joining in this (applied post) job and your aim for this job

2217


Stringer How many cm goes to landind

1318