how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / balachandra mahendra
cement=8.3
sand=0.414
metal=0.76
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to find out slope footing concrete
how u design STAGING for Superstructure in BRIDGE construction?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
difference between trapezoidal and pedestal footing and how the load acts on that
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
how to take concrete quantity for precast segment for viaduct project?
Concrete cover for slab, column, beam and footing?
how i can tak Quantity of mortar in block work
which red: used in roof teping, then use only cement
how to absorb to site basic corrections? which are the important correction?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)