Answer Posted / tariq
D2/162
| Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what are the five benefits of using standard terminology in the measurement process?
How can we demolish concrete beams?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
what are the proper pipes for salt water line
What are the causes of building collapse?
How high should the water tank be to provide a 60 psi at base of this water tower?
What are the different types of runners?
Define block?
Why should you show Client/Engineer activities clearly on the project plan?
how much shouid be the rate for ready mix concrete per cubic meter
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
How to do bbs in excel format