how many 1st class bricks in 1cu feet?
Answer Posted / yaseen jan
volume of brick= .75'x.25'x.375'
volume=.070cu ft
now in 100 cft = 100/0.070
=> 1428.57 nomber of bricks
now 10% mortar /////
deduction of mortorr= 10x1428.85/100 = 142.85
nomber of bricks
so net number of bricks = 1428.57-142.85= 1285.72
now for contengencies = 5%
so => 5x1285.72/100= 64.28
now total nomber of bricks= 64.28+1285.72=1350.006 NOMBER OF
BRICKS
HENCED PROVED.
but The problem is that if we find the quantity of mortar in masonry wall we consider that 30cft mortar use in 100cft masonry wall. and if we find the numbers of bricks we deduct 10% mortar from 100cft. so in this situation we deduct 10% and if we find numbers of bricks its 30%. so some problem created here plz solve the problem.
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Which are the Steel tests ?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
What is meant by scaffolding coefficient?
How we calculate the service time of buildings
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to calculate testing date
Define the various stages of the project planning process in construction.
wat would be the probable interview questions and GD topics for IOCL exam?
How do we calculate the power of centrifugal pump?
how to control PQI (Project Quality Index)
Why is the statue of liberty made of copper?
whats is difference between anchorage length and development length
yasser arfatcompleted his degree in civil from which university
What is rate of concrete surface rendering work per sqm