In Transformer testing at Shop test we normally test for
vector group, open ckt.,short ckt. but what are the other
test performed for transformer once it reaches at site.For
e.g:if the transformer is dry having rating 1000KVA?
Answer Posted / brahma
Also Double voltage double frequency, if customer ask impulse
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
what is the illumination level required for child play area?
What is the function of a neutral reactor.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING) I O (current operating)?
what is meant by the phrase 'static load' in case of shorting in a generator excitation system?
i have attended the interview on 4th June,08 at Kolkata in IOCL, can anybody tell me what is its result
Discuss about gear cutting machines.
what is the reason the main breaker is trip during the motor is running? (some time the breaker is not trip)
what is package substation.how many types they have
what is mean by parallel operation of permanent magnet generators
Is neutral transformer can be called as control transformer?
why -48 volts dc used in telecommucation
what are symmetrical and non symmetrical components in electrical installation.
Brief working principle of stabilizer,application & safety precautions
If I bring a basic electric meter from the States and hook it up in Costa Rica in a development that has only one transformer for the 50 homes, will it still be accurate regarding the usage of kilowatt hours?