How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / bharat hire
Lap length of bar depends on grade of concrete and design
bond. Owing to the Grade of concretes:
Grade of concrete) Tension Compression
M15 56.4d 45.15d
M20 47d 37.6d
M25 40.3d 32.25d
M30 37.06d 30.1d
For stirrups Hook length, it will be (-)2x10d
Bend, it will be (-3d) upto 12dia.
(-4d) above 12dia.
| Is This Answer Correct ? | 18 Yes | 10 No |
Post New Answer View All Answers
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
What is factor not to be taken in consideration in mix design?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
what are the challenges of being a team leader and a supervisor?
Explain the latest method to detect a crack in a building?
Why the finite element method is lower bound solution?
What is unit weight of normal concrete?
Concrete cover for slab, column, beam and footing?
What is difference between code and standard and specification?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
how many shuttering material required for 1000 sq.m built up area.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How to calculate the crank rod in slab
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.