Suppose " You are given a build with 5 modules to test as
per the Customer request after finalization of SRS, But the
SRS contains only documentation about 4 modules. On what
basis you will continue the testing of 5th module." ?
Answer Posted / prabu
Exploratory method of testing will applied on this case.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the differences between web applications and client and server applications?
What about manual testing opening in bangalore in September. Not getting a single interview call from last one month.
how to test a store procedure?
About Testing
I have interview on Guide wire testing. If you please share me.
What exactly you do as a Configuration controller?
when database testing comes into manual tesing
Architectural structure of the insurance project?
What does entry and exit criteria mean in a project?
Tell me the advantage and disadvantage of cookies?
You must test a trouble report where the problem cannot be reproduced. You tried using various test data files and mutations from the data files the customer sent along with the trouble report. The software does not fail the way it did at the customer's site.
You may be overqualified for this position we have to offer
What are the challenges you faced in your project (Testing) and in your company?
Write the test cases for yahoo home page
What is frame level testing and how do we test it?