Why Two Transformers aside shoud be supperated by concreted
wall?
Answer Posted / sasi karthick a
It is fire wall, during fault condition if transformer at
fire it should not spread to other equipment/buildings.
As per IS, the thickness should be 350mm brick wall/230mm
concrete wall. Height of the wall shall be decided based on
the height of x'frm
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What are the classifications of oscillators?
How to minimize the eddy current losses?
A jet of fluid strikes a plate What was the force required to counter it?
What happen in ups if phase reverse?
What is the difference between hot and cold loop testing?
Dears we deal in Chemical are Plate earthing. Kindly call if any requirement and questions. Tech Earth Solutions Mohit Verma 8791071007
what is the diference between the 4pole & 6pole DC Motors & what is advantage 6pole over the 4pole ?
What is the important precuations need tocarried out while working with Electrolite in Battery PM?
WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.
what is induction furnance? how many phase supply given io its coil for 15 or 20 ton furnance?
how to increase senstivity of ct
What are the three major categories of error?
What is a system?
In Electrical 'Single Line Diagram' cable nomenclature shows "2 X 1C X 630sq.mm to be provided for one incomer. The question is how many cable to be proved for one Incomer.
Why insulation level follows this order? transformer < bus bar < circuit breaker & Isolator < transmission line.