what is the allowable silt % in river sand for Dam
concreting.

Answer Posted / mohd sameer khan

7 % of silt is allowed.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Time period of a building and its relation with frequency ?

756


Forces in a Shear Wall are in plane or out of plane ?

676


roll of DLC in road constructions

1421


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2145


What are the causes of building collapse?

672






How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1779


How many pyramid in egypt?

645


What are the important hardware systems used for cad?

691


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

3252


how to caliculate required amount of cement and sand required for 1cu.m.

1755


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

1673


can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.

1599


An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.

1561


Can we apply curing compound on ceiling (slab Bottom)

370


How will you Engage Labours on Site?