9*8m slab 1:2:4 ratio use for M20 mix how much cent is
require it will become in cum but i want bags.
Answer Posted / sandeep bhardwaj
The Nominal mix for M20 is 1:1.5:3 not 1:2:4,all above answers
are correct,but you shoudd have to calculate by this ratio.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Define relative co-ordinates?
how we check the thickness and line of ceiling plaster.
what is difference between GTS bench mark and temporary bench mark
what is Short bored pile foundation.
How much material will consume for following specification water tank (9*7.5*6 feet)?
What is the release of lien?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
dialation means
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
How many pyramid in egypt?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how we can find sieve #4 is 4.75mm?