9*8m slab 1:2:4 ratio use for M20 mix how much cent is
require it will become in cum but i want bags.
Answer Posted / sandeep bhardwaj
The Nominal mix for M20 is 1:1.5:3 not 1:2:4,all above answers
are correct,but you shoudd have to calculate by this ratio.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what r you reqired for concrete baching plant?
How to calculate the crank rod in slab
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How many cum of 9.5mm stone in 1 ton ?
Explain how you can turn off the display for dimension in CAD?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
How many cement sand ballast in cc 1:4:8 40mm
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
explain what do you mean by the property development.
what is c4x light weight cement blocks
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
water leak detection system question & answer
what is the tensile strength of 10swg and 8swg gabion wire?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress