Answer Posted / uday
.210kg/sq.mtr
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what is the productivity in aluminium shuttering per day
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
what are RIB slabs explain about it
crank types
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
insted of bentonite we can use any alternate material in piling ?
types of survey and levelling instrument ?
What are the basic use of runners and standards of pipelines?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
what is difference between fluidity and workability also how palsticizer works
how can we calculate steel value, depending on load
what is the name of shuttering oil used in oman