how amny bricks of size 240 mm X 120 mm X70 mm are required in
100 cubic meter brickwork. How much cement is required at 10
mm masonry and at 4:1 sand cement ratio and how much cubic
meter of sand is required for the above work.

Answer Posted / vijayshankar

1 Brick = 0.24*0.12*0.070 = 0.002016 Cu.m
For 1Cu.m = 1/0.002016 = 496 Bricks
For 100 Cu.m = 100*496 = 49600 Bricks.

Cm ratio 1:4
Consider the thumb rule method 25% of Cement mortar
required for the brick work
=0.25*100= 25Cu.m of Cement mortar
That means 25 Cu.m of Sand is required

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

difference between fc and fc'?

1413


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

1426


What is the diameter of the 3"inch nails?

1623


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

2024


How to take labor charges for construction of 1cum of concrete?

791






Where will be the maximum bending moment in a TEE Beam?

6741


Why nautical mile is different from statute mile?

830


can i get hindi version of is codes based on civil engineering?

3991


Slump Values for works?

1866


What is the meaning of soil reinforcement?

763


What are the problems one might face while having a Cantilever balcony?

1177


What are the main reasons for conducting pull-out tests for soil nails?

826


What is the difference between EPC,DBOOT and BOOT.

23700


What is factor not to be taken in consideration in mix design?

3211


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1892