if the length and breath of footing is 1.2m x 1.2 m what
will be the length and breath of foundation trench
Answer Posted / neelam saroj
Am not agree with the above posted answer because,
as we all know you can not dig the exact paper size trench
practically on ground,
so, answer could be = length of Footing + extra pcc length
(if not considered then also its Ok)+ extra digging portion
(depends on excavater for its better working)
= 1.2 + 2 X 0.150 + 2 x 0.300
= 2.1m
So Length/Width of trench = 2.1 X 2.1 m
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
Did any of the egyptian pyramids ever fall down?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
I need old MMUP exam question and answer for Civil engineering
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
Spider cracks occur in beam bottom due to––
what is right & short method of measurement of slab&beam
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
explain the rale of the government in the construction industry
why the openings of sieves are square io size?
how to calculate rate analysys of 1:6 plastering 10 sq m
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)