How much wastage we considered for cement
Answer Posted / senthil.s
3% for steel and 1% for cement
Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what r the precaution for high in atp tempareture,low in atp tempareture
Why should appointment store person for project ? what is the benefits for company ?
What is the l/d ratio of cantilever beam?
In earth work 1300 cum soil how to calculate how many liters require in water
What are the different theories of failure under static load?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
Explain major differences between routing maintenance and major maintenance.
Explain the mechanism of cavitations in pipes and drains?
What is thumb rule in quality and quantity estimation of a Residential building??
Tell me about triple point of water.
What is meant by a context menu in a cad software?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
residential buildings,mixing of concrete,structural,construction material,site handling.