How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / syed mohd. fareed
Hook - 9d (d- dia of bar)
Bent up - 0.42D (D- centre to centre vertical distance between bent portion and bar )
Lap - 50d (d-dia of bar)
| Is This Answer Correct ? | 50 Yes | 12 No |
Post New Answer View All Answers
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Detection of a beam & a girder areββββ
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Which type of plywood & sizes using in construction projects ?
what is cross hair cursor?
What is the Null Point of chimney in Power Plant
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
it is a corrected question." make a list of engineering property(properties) of soil.
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
What is the basic difference between OPC
What is meant by Crystal Concrete?
States some of the tool bars used in cad?