Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1.how to calculate energy units in our home at singe phase,
2.415V,63A wiring what will use thickness of wire

Answer Posted / m.radhakrishnan

Energy=power *Time
Power=V*I*POWER FACTOR
how many hours consume that power, Example: 60 watts lamp
consume power in 20 hours. Energy=60*20=1200 watts hour=1.2
kilo watt hour=1.2 unit

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the operation of variable frequency transformer?

1098


What is maximum power transfer theorem?

1059


formula for calculation of switchgears(i.e. contactor, fuse, cb, relay etc.), if load current is given?

2169


Compare salient pole and cylindrical rotor machines.

1853


How can i get my certificate of competency as an electrical supervisor? I have complicated my B.Tech from Uttarakhand technical university this year (2012).

4480


What is the function of attenuator in cro?

1161


What are the factor to be consider for CT selection in 132kV substation?

2039


Air circuit breaker safety

1373


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1889


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

2081


what is the formula to calculate voltage drop/loss on 66KV Transmission Line?

3661


what is the string efficiency

5179


Load transfer in 11kv double busbar switchgear - operation.

1924


List advantges of active filter over passive filter?

1064


Pls tell me whether we can use EN3A material for shafts of Permanent magnet alternator.What will be the effect of magnetic and nonmagnetic material for shafts on magnetic properties of PM rotor .

3459