Answer Posted / rajesh.d.v.s.p.
normal design per square meter of slab we take 15kg of steel
hear thay given 100 sq.ft
1sq.ft = 0.0928sqm
100sq.ft=.0928*100=9.2 sq.m
total steel requried = 9.2*15=138 kgs
| Is This Answer Correct ? | 8 Yes | 8 No |
Post New Answer View All Answers
What are your goals?
What is portland cement
Questions related to civil.engg in company
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
which has high compressive strength between hollow block and brick masonry?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
Define mirror?
what's the formula for calculate pcc for matt(45mm aggregate)?
What is Density of cement, sand & aggregate ?
define the strength
Reinforcement details at hinged joint
What is Refuse Area In High Rise Building ?
Basic questions of civil engineering
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
to minimize budget cost of building , what can i do