How to calculate material requirement for 230mm thick, 1 sq.m
brick masonry?
Answer Posted / rohit dhingra
volume of mix = 1x0.23 = 0.23 cum
no. of bricks = 0.23x500 = 115 Nos
as for mortar ratio is 1:6 assumed.
cement require = 1.25x0.23=0.2875 bag or say 14 kg cement
sand require = 0.23x0.23=0.052 cum
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
how to calculate steel for slab or footings?
What Are The Steps Involved In The Concreting Process, Explain?
What is binding spacing of the rebars at lapping zones.
what is meant by csr in foundation? what is sbc?what is meant by contour line?
What is the tallest man made structure in the world?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
How can you achieve soil enforcement?
what is the mix design for M:60 with micro silica andmetakaoline?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
what is Brest Wall?
What are segregation and bleeding?
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
quantity of material needed for rubble stone masonry for 1:4 and 1:6