In 250x250mm cube, how much there will be
cement,sand,water,and gravel
Answer Posted / dip
Question data is incomplete, you need to tell Grade of Cube
First
If its M-15 unit wt of conc 2400kg/m3
Ratio will be 1:2:4
So Equation will be 0.5x + 1x + 2x + 4x = 2400
(0.5 is water content and 2400 is density of concrete )
so x = 320 Kg/m3
so theanswer is for cement (320*4)=1280kg/m3
and it will be( 1280/1000^3)=1.28*10^-6kg/mm3
in 250mm cube it will be 3.2*10^-4
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Explain what is change order request?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
What is limit state method and working stress method and ultimate method
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
How much time Required for PPR pipe network testing
How to build the floor to ceiling bookcase?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?